CRGP

Skip to content

Home > News

Glasgow University Lecture Theatre

03 December 2009

Glasgow University Lecture Theatre

Refurbishment works are now complete to Lecture Theatre 1 within the Boyd Orr Building at Glasgow University.

The new facility has the largest seating capacity of all Glasgow University lecture theatres, with a capacity of 306, and is very much in demand for both students and on occasions the general public.

The refurbishment includes the latest information technology and improved fire strategy.

The existing concrete structure of the Boyd Orr building precluded any significant alterations to the configuration of the theatre, other than the removal of the outmoded projector room.

The excellent acoustics of the original theatre have been retained, and augmented with new, improved sound control systems.

New projectors and adjustable screens have been installed together with relay screens towards the rear of the theatre to assist viewing from there.

Variable scene setting lighting controls are located in the teaching desk, and the theatre is equipped with infrared hearing assistance and Wi-Fi technology. The teaching desk has a variable height control allowing adjustments for a lecturer in a standing or seated position.

Dual directional seats allow 54 persons to work in groups with data and power facilities to the group locations allowing them to interact with the theatre's audio visual systems.

CRGP provided Architectural services.

All news stories

9/12/2009 St Peter's Free Church Re-Opens
St Peter's Free Church in Dundee re-opens following major refurbishment.
3/12/2009 Glasgow University Lecture Theatre
Refurbishment complete to Lecture Theatre 1, Boyd Orr Building, Glasgow University
23/11/2009 CRGP Win Top Defence Award
Richmondshire Lines Junior Ranks Mess Facility, Catterick
20/11/2009 Quality Management System
Successful upgrade of our Quality Management System to BS EN ISO 9001:2008
23/10/2009 More Schools Awarded
CRGP has been awarded 2 further schools through Graham Construction / North Lanarkshire Council
9/10/2009 St Mary's Church, Thornbury, Bristol
Proposals developed for the re-ordering of this beautiful 12th century Grade 1 Listed Church
16/08/2009 Bearnock Lodge, Glen Urquart
Remodelling of shooting lodge, built 1865
9/07/2009 Coltness High School, Wishaw
CRGP has secured Planning Consent for this secondary school in Wishaw, North Lanarkshire.
7/06/2009 Speyside 24hr Challenge 2009
CRGP Team raises over £1,600 for Prince and Princess of Wales Hospice
1/05/2009 City Centre Church Re-opens
Glasgow's St George’s Tron Parish Church re-opens following major remodelling