Langside Parish Church

CRGP Langside Parish Church 2

The original Langside Parish Church was erected on Ledard Road on Glasgow's south side in 1908. A series of floods damaged the foundations of the original Church and in 1995 the building was demolished and replaced with a modern Church more suited to its needs and easier to maintain.

The works were carried out by Fleming Buildings of Lenzie.

On 8th May 2009 the Church suffered a serious fire causing extensive damage to much of the building and totally destroying the Sanctuary.

The church took this opportunity to develop plans for reinstating an extended Church to accommodate a steadily growing congregation.

CRGP designed a new light and airy circular ‘Garden Room' entrance, and an upper floor with meeting room and a mezzanine floor to the Sanctuary. The stained glass windows, originally salvaged from the 1908 Church, were repaired and reinstated in the new Sanctuary, these include The Gospels along with two other major windows designed and made by stained glass artist Gordon Webster in 1952. Velux roof windows flood the Sanctuary and foyer with natural light whilst a labyrinth is set into the Sanctuary floor.

A Low Carbon Heating and Ventilation System was installed which includes two air source heat pumps, a high efficiency gas-fired back-up boiler and underfloor heating. This provides an efficient, comfortable heating system that minimises the cost, energy use and carbon emissions to heat the building and to provide hot water. The heat pumps are located externally. They act much like a fridge in reverse, in that they draw warmth from the outside air and, through a heat pump the difference in temperature is multiplied, and used to warm the water entering the boiler, so the boiler has less work or even no work to do, and uses less energy. The heat pumps provide the majority of the heating requirements, around 90% of the time. For the remaining 10% of the time, when it is particularly cold outside, the gas boiler will assist the heating system. Interestingly during a prolonged period of cold weather there was no demand for the boiler to operate.

Most areas of the Church have underfloor heating installed. This runs at a lower temperature than conventional radiators, whilst providing the same heat output. Less energy is needed for underfloor heating than conventional radiators.

The Ventilation system has a heat recovery unit installed, this takes the heat from the air being extracted from the church, heat that would otherwise be wasted as it is carried outside. This heat is used to warm the fresh air being supplied into the Church.

Works were carried out again by Fleming Buildings of Lenzie and Langside Parish Church was re-opened for Easter Sunday 2011. The microrenewable low carbon heating system was installed by Fusion Mechanical Services Limited. New, state of the art audio, visual and lighting systems were installed by SSK Conferences and Events.

Much of the Church's artwork was destroyed in the fire, including ‘The Last Supper' by artist and church member, Stuart Duffin RSA. Stuart spent 12 months creating a spectacular new 12 foot oil on canvas ‘The Last Supper' which is now proudly displayed in the Sanctuary.

Langside Parish Church provides a warm welcome to all visitors and features in the annual ‘Doors Open Day'. We highly recommend a visit!

CRGP Langside Parish Church 3

CRGP Langside Parish Church fire 01

Case Studies

Loch Lomond Arms Hotel, Luss
Mull and Iona Abattoir
Fire Damage Reinstatement
Cadell House / Kudos
Waterloo Street / Wellington Street, Glasgow
The Famous Peacock Inn, Edinburgh
Refurbishment and Alterations to pub/restaurant
Venture Building
Sustainable Office Block
Crow Road / Strathcona Drive, Glasgow
Residential and Commercial Development
Spean Bridge Mill
Fire Damage Reinstatement
Camphill Vaults and Riva Restaurant
CRGP’s design for Camphill Vaults and Riva Restaurant marries the old with the new
Clydesdale House, Glasgow
Completion of Clydesdale House marks the first stage in the formation of the new Springhill Business Village, within Glasgow Business Park
Seaforth House, Hillington
Redevelopment of Seaforth House, Hillington Industrial Estate
The Schoolhouse, 101 Portman Street, Glasgow
Fit-out of former school building to provide new offices for CRGP Limited.
Parklands Country Club, Newton Mearns
Reinstatement of Leisure Club following serious fire.
Hamilton House, Hamilton Business Park, Hamilton
High specification new build offices
Border Toyota
New Car Showroom, Carlisle
TISO Glasgow Outdoor Experience
Conversion to Provide Unique Retail Outlet
78-80 Tollcross Road, Glasgow
Re-fit and upgrade of existing office accommodation
Bar Bacchus, Glassford Street, Glasgow
Fire/Water damage reinstatement of public house over two floors
Maryhill Road / Clarendon Street, Glasgow
Fire damage reinstatement of tenement property comprising flats, pub, restaurant and shops
Motherwell Civic Centre, Condition Survey
Little Rascals Nursery, Hawick
Flood Damage Reinstatement
The Subirachs Building, Howard St, Glasgow
Douglas Street, Glasgow