CRGP

Skip to content

Home > Portfolio

Kettle Produce

CRGP Architects and Surveyors were commissioned to provide Project Management, Architectural, Quantity Surveying and CDM Co-ordinator services for the reinstatement works required as a result of a major fire that had ripped through a vegetable-processing factory.

The fire destroyed a major portion of the facility including all cladding to the walls and roof of the processing facility such that the structural integrity of the building was compromised.

The Clients primary concern was to resume production and continue to service their supermarket customers as quickly as possible. The works were therefore carefully programmed into 5 phases which brought its own challenges to both the design team and the Contractor in terms of carrying out construction works within a live working facility.

Phase 1 included demolitions, site clearance and emergency works to make the building safe.

Phase 2 involved replacing the roof sheeting and cleaning the floor of the retained parts of the facility.

Phase 3 & 4 involved erecting temporary structures to recover production as soon as possible.

Phase 5 involved the completion of the remaining reinstatement works.

The structures generally comprised of a concrete floor slab and pad/ strip foundations with steel portal frames. The envelope was constructed from a pitched roof with profiled sheeting with metal cladding to external walls.

Services included a full plumbing installation, water services and full electrical installation.

In addition to this, CRGP advised and co-ordinated the supply and installation of the Client's specialist processing equipment via their supplier in New Zealand.

The severity of the fire damage required us to obtain Building Warrant and Planning Permission for the works which were carried out by Marshall Construction.

CRGP Kettle Produce 01

CRGP Kettle Produce 04

CRGP Kettle Produce 02

CRGP Kettle Produce 03

CRGP Kettle Produce 05

CRGP Kettle Produce 06

Case Studies

Sauchiehall Street, Glasgow
Fire Damage Reinstatement
Loch Lomond Arms Hotel, Luss
Mull and Iona Abattoir
Fire Damage Reinstatement
Cadell House / Kudos
Waterloo Street / Wellington Street, Glasgow
The Famous Peacock Inn, Edinburgh
Refurbishment and Alterations to pub/restaurant
Venture Building
Sustainable Office Block
Crow Road / Strathcona Drive, Glasgow
Residential and Commercial Development
Spean Bridge Mill
Fire Damage Reinstatement
Camphill Vaults and Riva Restaurant
CRGP’s design for Camphill Vaults and Riva Restaurant marries the old with the new
Clydesdale House, Glasgow
Completion of Clydesdale House marks the first stage in the formation of the new Springhill Business Village, within Glasgow Business Park
Seaforth House, Hillington
Redevelopment of Seaforth House, Hillington Industrial Estate
The Schoolhouse, 101 Portman Street, Glasgow
Fit-out of former school building to provide new offices for CRGP Limited.
Parklands Country Club, Newton Mearns
Reinstatement of Leisure Club following serious fire.
Hamilton House, Hamilton Business Park, Hamilton
High specification new build offices
Border Toyota
New Car Showroom, Carlisle
TISO Glasgow Outdoor Experience
Conversion to Provide Unique Retail Outlet
78-80 Tollcross Road, Glasgow
Re-fit and upgrade of existing office accommodation
Bar Bacchus, Glassford Street, Glasgow
Fire/Water damage reinstatement of public house over two floors
Maryhill Road / Clarendon Street, Glasgow
Fire damage reinstatement of tenement property comprising flats, pub, restaurant and shops
Motherwell Civic Centre, Condition Survey
Little Rascals Nursery, Hawick
Flood Damage Reinstatement
The Subirachs Building, Howard St, Glasgow
Douglas Street, Glasgow